access ladder and walkways Irish sea gas field

Jobaccess ladder and walkways Irish sea gas field
Summaryfabrication and installation of safety hand rails and platforms. On inspection the tank lids were corroded so had to be replaced
Descriptionfabricate new lids, cut off corroded old lids, weld the new lids in position complete with hand rails and safety toe boards
Fabrication materials42mm OD tube rolled to tank diameter cones fabricated 3mtr diameter out of 5mm mild steel plate
Completion DateMay 10, 2008
CategoryIndustrial